Energy
Well-Safe Solutions’ 1982-built rig wraps up triple P&A campaign in UK waters
CEII brief
Offshore Energy reported on 3 Nov 2026: Well-Safe Solutions’ 1982-built rig wraps up triple P&A campaign in UK waters.
Read the full story on Offshore EnergyThis 44-year-old rig has crossed the finish line at a multi-well subsea decommissioning campaign on the UK Continental Shelf (UKCS).
Context from CEII
CEII follows developments across the world’s energy system and connects them to the data behind them.
Original reporting © Offshore Energy. Headline and excerpt quoted with attribution; the full article is available on the publisher’s site. CEII’s context is the Centre’s own and does not represent the publisher.