Power
PJM puts generator performance at the center of its cold-weather plans
CEII brief
Power Engineering reported on 9 Nov 2026: PJM puts generator performance at the center of its cold-weather plans.
Read the full story on Power EngineeringForecast winter demand has climbed 7,500 MW since 2022 and is now above PJM’s all-time peak, while new supply lags and reserve margins tighten.
Context from CEII
Grids decide whether generation becomes power that homes and businesses can rely on. Generation mix, transmission and distribution losses, and tariffs together shape reliability and the case for investment.
91.9% of people worldwide had electricity in 2024Original reporting © Power Engineering. Headline and excerpt quoted with attribution; the full article is available on the publisher’s site. CEII’s context is the Centre’s own and does not represent the publisher.