Power
Nigeria targets economic corridors in power sector overhaul
Nigeria's Minister of Power has outlined a corridor-based strategy to address systemic constraints and improve electricity supply across key economic zones.
Key points
- Federal authorities have settled N1.23 trillion of verified legacy debts owed to power generation companies.
- The Presidential Metering Initiative has delivered over 2.8 million meters between 2023 and October 2026.
- Proposed 24-hour energy zones target the Lagos-Ogun, Abuja-Kaduna-Kano, and Benin-Enugu-Port Harcourt corridors.
What happened
Nigeria’s Minister of Power, Joseph Tegbe, has outlined a series of structural interventions aimed at resolving longstanding challenges within the country's electricity sector. Speaking during an interactive session with senior editors in Lagos, the minister highlighted gas supply shortages, ageing infrastructure, vandalism, transmission bottlenecks, and commercial liabilities as primary impediments to reliable power delivery, according to Nairametrics.
Tegbe noted that the Federal Government has disbursed N1.23 trillion out of N3.3 trillion approved by President Bola Ahmed Tinubu to clear verified legacy debts owed to generation companies. Additionally, the Presidential Metering Initiative has supplied more than 2.8 million meters to consumers between 2023 and October 2026.
Transmission enhancements have added over 1,300MVA to national capacity across multiple locations, including Apapa, Ikeja, and Kano. The government also plans to replace the six-decade-old National Grid Control Centre with a modern facility in Osogbo.
Strategy and security
To improve service delivery, the Ministry is pursuing a corridor-based electricity development strategy. The Lagos-Ogun axis and the Abuja franchise area, which represent more than half of national electricity demand, are slated as pilot locations for 24-hour energy zones, contingent on technical and commercial readiness.
On infrastructure protection, Tegbe reported that authorities have approved a coordinated anti-vandalism campaign backed by enhanced legal measures to safeguard critical power assets. He emphasised that sustained reform implementation and institutional collaboration remain essential for restoring public confidence and achieving market sustainability.
Why it matters
Reliable electricity remains a critical prerequisite for industrial productivity and economic expansion in Nigeria, where electricity use per person stood at 140.6 kWh in 2024, compared to the global average of 3,708.5 kWh, according to World Bank figures. Furthermore, World Bank data shows that only 62.5% of Nigeria's population had access to electricity in 2024. For investors and industrial consumers, the success of corridor-based 24-hour energy zones and the reduction of systemic generation and transmission losses will dictate the commercial viability of manufacturing and commercial operations across the country's main economic hubs.
Original reporting
This article draws on the following reports. Read them in full on the publishers’ sites.
Context from CEII
Grids decide whether generation becomes power that homes and businesses can rely on. Generation mix, transmission and distribution losses, and tariffs together shape reliability and the case for investment.
62.5% of people in Nigeria had electricity in 2024Countries in this story
Written by the CEII Desk, the Centre’s automated newsroom, from the reporting credited above and CEII’s own data. Facts are attributed to their sources; the publishers have not reviewed this article. Spotted an error? Tell our editors.